The WACC module calculates the WACC related costs on technology investments.
Interface plot missing!
| Description | Unit | A | B | |
|---|---|---|---|---|
| pm_delta_kap (all_regi, all_in) |
Depreciation rate of capital. | x | ||
| pm_lifetime_max (all_regi, all_te) |
maximum lifetime of a technology (generisdata_tech gives the average lifetime) | \(years\) | x | |
| pm_ts (tall) |
(t_n+1 - t_n-1)/2 for a timestep t_n | x | ||
| vm_costInvTeAdj (tall, all_regi, all_te) |
annual investments into a technology due to adjustment costs | \(T\$\) | x | |
| vm_costInvTeDir (tall, all_regi, all_te) |
annual direct investments into a technology | \(T\$\) | x | |
| vm_invMacro (ttot, all_regi, all_in) |
Investment for capital for ttot | x |
| Description | Unit | |
|---|---|---|
| vm_waccCost (ttot, all_regi) |
difference between WACC costs in current and previous iteration |
Limitations There are no known limitations.
Limitations There are no known limitations.
| Description | Unit | A | B | |
|---|---|---|---|---|
| p25_counwacc (ttot, all_regi) |
WACC markup for each country | x | ||
| p25_counwaccCostO (ttot, all_regi) |
reference level value of macro investments WACC costs of the cuurent and previous period (trillion USD) | x | ||
| p25_techwacc (ttot, all_regi, tewacc) |
WACC markup for each power technology in each REMIND region | x | ||
| p25_techwaccCostO (ttot, all_regi) |
reference level value of technology WACC costs of the cuurent and previous period (trillion USD) | x | ||
| p25_techwaccCostOPrev (ttot, all_regi) |
reference level value of WACC costs of the previous period | x | ||
| p25_waccCostOPrev_tewacc (ttot, all_regi, tewacc) |
reference level value of WACC costs of the previous period (trillion USD) | x | ||
| p25_waccCostO_tewacc (ttot, all_regi, tewacc) |
reference level value of WACC costs of the cuurent and previous period (trillion USD) | x | ||
| q25_invwaccCost (ttot, all_regi) |
Calculation of WACC costs for macro investments | x | ||
| q25_techwaccCost (ttot, all_regi) |
Calculation of WACC costs considering both new and existing system technologies | x | ||
| q25_totwaccCost (ttot, all_regi) |
Calculation of total WACC costs for both system technologies and macro investments | x | ||
| v25_invWaccCost (ttot, all_regi) |
WACC costs related to macro investments | x | ||
| v25_techwaccCost (ttot, all_regi) |
WACC costs for financing new and existing technologies in the system | x |
| description | |
|---|---|
| all_in | all inputs and outputs of the CES function |
| all_regi | all regions |
| all_te | all energy technologies, including from modules |
| in(all_in) | All inputs and outputs of the CES function |
| regi(all_regi) | all regions used in the solution process |
| t(ttot) | optimisation time, years between cm_startyear and 2150 with 5 to 20 years time steps |
| tall | time index, each year from 1900 to 3000 |
| teAdj(all_te) | technologies with adjustment costs on capacity additions |
| tewacc(all_te) | technologies with WACC data |
| ttot(tall) | time index with spin-up, years between 1900 and 2150 with 5 to 20 years time steps |